Construction started in Spring of 2006, and the home was completed in the Summer of 2007. Local companies and materials were used to add authenticity to our home. These details include the masonry work which used the local field stone, the log siding which was milled in Piedmont, and hardwood floors which were recycled from an old barn, the Dakota mahogany granite countertops which is quarried in Milbank, SD. The custom made pine furniture was crafted by a local furniture maker in Piedmont, SD. Some of the artwork, was obtained from the Rosebud Indian Reservation, near Winner, SD.
Sincerely,
The Lee and Jones Families