C118 Shipwatch | The Crow's Nest
Wild Dunes | Isle of Palms
Overview: Welcome to your stunning seaside retreat perched within the exclusive gated community of Wild Dunes. Surrounded by floor-to-ceiling windows, this corner villa is bathed in natural light, offering breathtaking views of the pool and ocean.
Living Area: Our airy, open-concept design connects the spacious living room, dining area, and a modern, fully equipped kitchen. The living area features a large flat-screen TV and a comfortable queen sleeper sofa. From here, step through the glass sliding doors onto your private balcony to take in the fresh sea air.
Bedrooms & Bathrooms:
Primary Bedroom: Features a king-size bed, an en-suite bathroom with a tiled walk-in shower, and private access to the balcony.
Second Bedroom: Offers two twin beds and a private bathroom with a shower/tub combo.
Third Bedroom: Includes a king-size bed, its own private balcony, and an en-suite bathroom with a tiled walk-in shower.
Amenities:
Fully equipped kitchen with stainless steel appliances (refrigerator, oven, microwave, dishwasher).
In-unit washer and dryer.
Free Wi-Fi & Streaming TV.
Central air conditioning.
Fresh towels and linens provided.
Two parking spots available
This property is licensed with the City of Isle of Palms:
P-00459
SHIPWATCH CONSTRUCTION
The Shipwatch Condos are scheduled to have work done on the exterior of the buildings during Fall/Winter 2026. Scaffolding will be placed on both the road-front and ocean-front sides of the buildings to access exterior areas requiring work, including balconies. This will directly affect the fourth-floor condos, as they are two-story units with two fifth-floor balconies. Construction on the balconies will require both fifth-floor balconies to be closed to guests during this time. The balcony doors will also be locked from the exterior while the roofing coating surface is being resurfaced.
Work will be conducted between 8 AM and 5 PM on weekdays only. Prep work can start as early as 7:30 AM and clean-up may go until 5:30 PM. Full-length scaffolding will be on the ocean-side and the street-side of each building.
Affected dates:
Building A: Nov 12, 2026 - Dec 29, 2026
Building B: Nov 25, 2026 - Jan 12, 2027
Building C: Dec 10, 2026 - Jan 25, 2027
Building D: Dec 23, 2026 - Feb 5, 2027