Summary:
Regency Isle 903
The Space:
Rich jewel tones resonate throughout this beautifully furnished, beachfront property located on the ninth floor of Regency Isle, where the views of the Gulf of Mexico extend all the way to the horizon.
As you step inside, you'll be greeted by upscale tile floors, tasteful decor, and a wealth of recent updates made in 2021. You'll be surrounded by new furnishings (including the queen-size sofabed, love seat, lamps, wall art, TV cabinet, and rug) that beckon you to stretch out and relax. Access to the oversize balcony is yours from both the primary bedroom and the living area, offering new outdoor lounge chairs, a new high-top dining set for four, and a new patio end table.
King-size beds are provided in both bedrooms, with the sleeper sofa rounding out the total accommodations to six people. Your primary suite includes a Jacuzzi tub and a separate shower, while a wet bar is on hand in the living area. Rediscover your passion for the coast in this amazing spot!
Things to Know
Please be advised that scheduled building and balcony improvement work will take place from October 5, 2026, through January 2027. As part of this project, the building exterior will receive a new durable wall coating, and various balcony-related improvements will be completed.
Balcony work for this unit is currently anticipated between November 9 and December 3, 2026 (dates are subject to change due to weather and construction conditions). The balcony resurfacing process is expected to take approximately 19 days, during which time the balcony will be completely inaccessible to guests. All patio furniture and balcony items will be moved inside the unit and must remain there throughout the project. Due to the resurfacing process and required curing periods, furniture cannot be returned to the balcony at any time during the project, even if work is not actively taking place on a particular day. Guests should also expect workers to be present on or immediately outside the balcony during scheduled work hours.
Additionally, the outdoor pool and hot tub will be closed from November 9 through December 3, 2026, while construction activities are taking place in the area.
Guests should expect construction-related noise, equipment, dust, vibrations, and worker activity around the property during daytime hours throughout the project.
Please note that the building elevator may be closed or unavailable at certain times during construction, requiring guests to use the stairs. If you or anyone in your party has difficulty using stairs, please take this into consideration before booking or traveling.
During the construction period, the property will operate under an Open Parking Policy. A valid parking pass will still be required for all vehicles; however, all parking spaces will be available on a first-come, first-served basis, and reserved parking spaces cannot be guaranteed.
We appreciate your patience and understanding as these important building improvements are completed and apologize for any inconvenience they may cause.