Enjoy oceanfront living in this spacious, light-filled Carlsbad townhome, just steps from the Pacific 🌊🏖️. The main level features a comfortable living room with ocean views, while the front porch offers seating and a grill for easy outdoor meals.
The private primary suite includes a balcony, perfect for taking in the coastal views. A lower-level bonus room with a shuffleboard table provides extra space and fun for kids or groups.
‼️IMPORTANT NOTE: this townhome is situated directly along Highway 101, which means that daytime noise from passing cars will be audible.
🛌🏻 SLEEPING ARRANGEMENTS
· Master Bedroom: King bed, private balcony with ocean views, walk-in closet
· 2nd Bedroom: queen bed
· Bonus room: Full size futon and full size bed
🛁Master Bathroom: Tub/shower combo
· Hallway Bathroom: walk-in shower
🏡 ✨HIGHLIGHTS✨
· Shuffleboard in the bonus room
· Front porch with seating
· BBQ grill
· Smart Tvs with Roku
· Central heating & AC
· Fully stocked kitchen with bar stool for 2
· Dining area for 4
· Washing machine and dryer
· Beach gear provided
🚘 PARKING
· Up to 1 vehicle in the garage. Limited guest parking on-site
📝 HOUSE RULES
· Max occupancy: 5
· Quiet Hours: 9pm - 9am
· No parties, gatherings, or events allowed - Strictly enforced. (a $500 fine will be imposed per occurrence.)
· THIS HOME IS NOT PET FRIENDLY.
· No smoking anywhere on the property ($250 fine applies)
🎗️ GOOD TO KNOW
· Home is not baby/child proofed—please supervise children at all times.
· CAMERAS: Exterior cameras record 24/7
· This home has three large stairways, as well as a couple of stairs outside the front door and up to the kitchen.
· The bonus room does not have a door for privacy. This floor is located one flight of stairs down from the garage access.
· Beach stairway and pavement construction is scheduled Monday–Friday, 7 AM–4 PM, and will pause from Memorial Day through Labour Day. The widened pavement will remain open during summer, while some beach stairways may be closed. At least two stairways between Tamarack and Pine will remain open until the project is completed in May 2027.
-STVR 2026-0047